Client/Main Contractor: Amey Projects
Package Details: Extensive earthworks, reinforced concrete substructures to 14000m2 warehouse and 1000m2 office block, including sub-base preparation using laser controlled plant. Extensive drainage including interceptors and outfalls with reinforced concrete headwalls. 28000m2 of external yard slabs and 10000m2 car park, the majority being block paved.
This was an extremely fasttrack program - the contract period was reduced from 37 weeks to 26 weeks to ensure handover to the client prior to the run-up to Christmas
|